Our website is made possible by displaying online advertisements to our visitors.
Please consider supporting us by disabling your ad blocker.

Download links will be available after you disable the ad blocker and reload the page.

Scientific American Supplement, No. 303, October 22, 1881

by Various



Download options:

  • 204.03 KB
  • 504.30 KB
  • 270.46 KB

Description:

Excerpt


NEW EIGHTY TON STEAM HAMMER AT THE SAINT CHAMOND WORKS

Ever since the improvements that have been introduced into the manufacture of steel, and especially into the erection of works for its production, have made it possible to obtain this metal in very large masses, it has necessarily been preferred to iron for all pieces of large dimensions, inasmuch as it possesses in the highest degree that homogeneousness and resistance which are so difficult to obtain in the latter metal. It has consequently been found necessary to construct engines sufficiently powerful to effect the forging of enormous ingots, as well as special furnaces for heating them and apparatus for manipulating and transporting them.

The greatest efforts in this direction have been made with a view to supplying the wants of heavy artillery and of naval constructions; and to these efforts is metallurgy indebted for the creation of establishments on a scale that no one would have dared a few years ago to think of. The forging mill which we are about to describe is one of those creations which is destined to remain for a long time yet very rare; and one which is fully able to respond, not only to all present exigencies, but also, as far as can be foreseen, to all those that may arise for a long period to come. The mill is constructed as a portion of the vast works that the Compagnie des Forges et Aciéries de la Marine own at Saint Chamond, and which embrace likewise a powerful steel works that furnishes, especially, large ingots exceeding 100 tons in weight.

The mill consists, altogether, of three hammers, located in the same room, and being of unequal powers in order to respond to different requirements. The largest of these hammers is of 80 tons weight, and the other two weigh respectively 35 and 28 tons. Each of them has a corresponding furnace for heating by gas, as well as cranes for maneuvering the ingots and the different engines. The general plan view in Fig. 4 shows the arrangement of the hammers, cranes, and furnaces in the millhouse.

[Illustration: FIG. A.—ELEVATION OF A HAMMER. FIG. B.—PROFILE VIEW]

The gas generators which supply the gas-furnaces are located out of doors, as are the steam-generators. The ingots are brought from the steel factory, and the forged pieces are taken away, by special trucks running on a system of rails. We shall now give the most important details in regard to the different parts of the works.

The Mill-House—This consists of a central room, 262 feet long, 98 feet wide, and 68 feet in height, with two lean-to annexes of 16 feet each, making the total width 100 feet. The structure is wholly of metal, and is so arranged as to permit of advantage being taken of every foot of space under cover. For this purpose the system of construction without tie-beams, known as the "De Dion type," has been adopted. Fig. 1 gives a general view of one of the trusses, and Fig. 5 shows some further details. The binding-rafters consist of four angle-irons connected by cross-bars of flat iron. The covering of corrugated galvanized iron rests directly upon the binding-rafters, the upper parts of which are covered with wood for the attachment of the corrugated metal....