Excerpt


FACT SHEET

Defense Nuclear AgencyPublic Affairs OfficeWashington, D C. 20305

Subject: Project TRINITY

Project TRINITY, conducted by the Manhattan Engineer District (MED), was designed to test and assess the effects of a nuclear weapon. The TRINITY nuclear device was detonated on a 100-foot tower on the Alamogordo Bombing Range in south-central New Mexico at 0530 hours on 16 July 1945. The nuclear yield of the detonation was equivalent to the energy released by detonating 19 kilotons of TNT. At shot-time, the temperature was 21.8 degrees Celsius, and surface air pressure was 850 millibars. The winds were nearly calm at the surface; at 10,300 feet above mean sea level, they were from the southwest at 10 knots. The winds blew the cloud resulting from the detonation to the northeast. From 16 July 1945 through 1946, about 1,000 military and civilian personnel took part in Project TRINITY or visited the test site. The location of the test site and its major installations are shown in the accompanying figures.

Military and Scientific Activities

All participants in Project TRINITY, both military and civilian, were under the authority of the MED. No military exercises were conducted. The Los Alamos Scientific Laboratory (LASL), which was staffed and administered by the University of California (under contract to the MED), conducted diagnostic experiments. Civilian and military scientists and technicians, with assistance from other military personnel, placed gauges, detectors, and other instruments around ground zero before the detonation. Four offsite monitoring posts were established in the towns of Nogal, Roswell, Socorro, and Fort Sumner, New Mexico. An evacuation detachment consisting of 144 to 160 enlisted men and officers was established in case protective measures or evacuation of civilians living offsite became necessary. At least 94 of these personnel were from the Provisional Detachment Number 1, Company "B," of the 9812th Technical Service Unit, Army Corps of Engineers. Military police cleared the test area and recorded the locations of all personnel before the detonation.

A radiological monitor was assigned to each of the three shelters, which were located to the north, west, and south of ground zero. Soon after the detonation, the monitors surveyed the area immediately around the shelters and then proceeded out the access road to its intersection with the main road, Broadway. Personnel not essential to postshot activities were transferred from the west and south shelters to the Base Camp, about 16 kilometers southwest of ground zero. Personnel at the north shelter were evacuated when a sudden rise in radiation levels was detected; it was later learned that the instrument had not been accurately calibrated and levels had not increased as much as the instrument indicated. Specially designated groups conducted onsite and offsite radiological surveys.

Safety Standards and Procedures

The safety criteria established for Project TRINITY were based on calculations of the anticipated dangers from blast pressure, thermal radiation, and ionizing radiation....